Shifts and Tasks: Special Rules Explained

Updated

A shift is a level of this puzzle game: a run of rows to ship, and each one is a little harder than the last. After the first, every shift also has a twist of its own and sets a task that pays more. This page lists how long a shift is, every kind of shift, every task, when the second crane comes out and how the pace builds.

How long a shift is

You sign a shift off by shipping its rows. The count is eight for the first three shifts, then one more for every three shifts, and never more than sixteen.

ShiftsRows to shipTime for a "finish in time" task
1–382:30
4–692:50
7–9103:10
10–12113:25
13–15123:45
16–18134:05
19–21144:25
22–24154:40
25 and on165:00
The rows grow with the shift; the time for the finish-in-time task grows with them.

A 3-2-1 count-in starts every shift, and the progress bar at the top shows one block for every row you must ship. When the last row goes, the field stands still for a few seconds while the worker celebrates, then the card between shifts comes up.

The card between shifts: Shift 1 done, Bonus +300, Task done: bonus ×1.5, four totals, the next shift is Steel with a task to ship two rows in a row, the double-bonus button and Next shift.
The card between shifts tells you what is next.
  1. The shift bonus.
  2. Task done: the bonus was multiplied by 1.5.
  3. The totals of the shift.
  4. The next shift's kind and task.
  5. The optional ×2 bonus (an ad).
  6. Start the next shift.

The kinds of shift

The first shift of every game is a Regular one. Each later shift draws one of the other five kinds, and never the same kind twice in a row. The card between shifts and the top panel always tell you which one you are in.

KindWhat changes
RegularNo surprises. Only the first shift of a game.
SteelTwice as much steel falls.
DarkThe lights fail far more often: the first power cut comes within about 15 seconds, and the next follows 15 to 25 seconds after the light returns.
RushA faster crane with less rest, and a double shift bonus.
ExplosiveFar more dynamite comes down: about one crate in eleven.
GenerousUpgrades come down twice as often.
The six shift kinds.

Power cuts

From shift 2 on, the lamps fail now and then: a flicker as a warning, then about six seconds in which only a patch around the worker can be seen. In ordinary shifts the next cut follows 45 to 75 seconds after the light returns. Count-ins and the end of a shift always come back to the light.

The warehouse almost black, with only a small area around the worker faintly lit.
Lights out: the worker and the cells around him are all you see.
  1. The only part of the field you can see during a power cut.

The second crane

From shift 3, a second crane comes out and works alongside the first, with a "Second crane!" notice. Each crane rests longer when both are working, so the pressure grows without doubling. The crane goes off duty again when a new shift starts. When it comes out depends on the shift:

ShiftsThe second crane comes out
1–2Not at all
3–7Halfway through the rows
8–14After a third of the rows
15–19After a quarter of the rows
20–29After a quarter, or from the very start of the shift if you reached shift 20 fast (about an hour and a half of play from shift 1) and without continuing a lost game
30 and onFrom the very start of the shift
When the second crane joins.
The top of the screen in shift 3 with the progress bar half full: two cranes, the left carrying a cardboard crate and the right one empty.
Shift 3 at four rows out of eight: the second crane has just come out.
  1. The first crane, carrying a crate.
  2. The second crane, out for the second half of the shift.
  3. Four of eight rows shipped: the halfway point.

The pace

Everything gets faster with the shift: the crane moves faster, crates fall faster and the music speeds up. The rise is quick in the first shifts and flattens around shift 10; after that the pace grows five per cent a shift, up to double at shift 30. Inside every shift you start at about four fifths of that pace, and reach full speed halfway through the rows. If you would like a head start in practice, the settings let a new game start from any shift from 1 to 5 (the achievement for five shifts then does not count).

The three tasks

Each shift sets one optional task, drawn at random, and shows it on a tag under the progress bar. A target mark means it is open, a green tick means it is met and a red cross means it is lost. Meet it by the shift's last row and the shift bonus is half as big again.

TaskHow it is met
No hits this shiftYou get through the shift without a crate landing on you. A hit that a helmet saves you from still counts as a hit, and so does a dynamite blast.
Finish within 2:30You ship the last row before the clock runs out. The time grows with the rows (see the table above) and counts only play time, not pauses. The countdown sits at the right of the top panel and turns red for the last 20 seconds.
Ship two rows in a rowAt some point in the shift you ship a row within 8 seconds of the one before: two at once with a single crate counts too.
What each task asks for.

Completing a "no hits" shift also earns the "Not a Scratch" achievement; see achievements. The bonus itself is explained in scoring.

The top panel of a Rush shift with the shift number, a progress bar three blocks full of nine, the task Finish within 2:50, the word RUSH and a countdown of 2:48.
The top panel of a Rush shift with a time task.
  1. The shift number.
  2. The rows shipped so far, out of the shift's nine.
  3. The task.
  4. The shift kind, in yellow.
  5. The time left for the task.
  6. Your upgrade counters.